Main Contractor: MPX - Value: £2.2m

Client: GIG Facades - Maximum Labour Levels: 40 Operatives and Management

Part of the prestigious Chelsea Barracks Project, VAM are pleased to be working with GIG on 3 buildings of Phase 4.

The project mainly consists of windows (both Aluminium and Steel), with the Penthouse Areas being Unitised Curtain Walling. VAM were able to highlight installation flexibility due to the differing façade types:

  • Windows and Doors
  • Unitised Curtain Walling
  • Steel Sliding Door systems, assembles on site
  • Louvres
  • Rainscreen Cladding
  • Coping systems
Enquire